Having arrived safely home from Marty's, I had a great time, I arrived inspired. So I started working on my Layout
I have a bridge that had a little kink in the rails approaching it. It was a problem for my USAT articulated container cars and also my Aristo Streamliner cars.
So I moved the bridge so it is more inline with the tracks approaching it. I there for had to re do some road bed. Since I have concrete road bed we all know what a chore it is to change anything.
Well not this time
Here is was I did.
Took me about 2 hours to dig the trench. I set the forms, Today I poured the concrete.
I decided to add to my layout. This area will be a industrial park. It will be where I am going to put one of the car barns I made.
The are building swimming pools in the development south of me. They are desperate to have some place to put the dirt. So The guy is giving the dirt away if you will let him dump it on your property.
There are 15 loads at 12 tons each.
I climbed to the top of this pile to take the next two pictures
I have a bridge that had a little kink in the rails approaching it. It was a problem for my USAT articulated container cars and also my Aristo Streamliner cars.
So I moved the bridge so it is more inline with the tracks approaching it. I there for had to re do some road bed. Since I have concrete road bed we all know what a chore it is to change anything.
Well not this time
Here is was I did.
Took me about 2 hours to dig the trench. I set the forms, Today I poured the concrete.
I decided to add to my layout. This area will be a industrial park. It will be where I am going to put one of the car barns I made.
The are building swimming pools in the development south of me. They are desperate to have some place to put the dirt. So The guy is giving the dirt away if you will let him dump it on your property.
There are 15 loads at 12 tons each.
I climbed to the top of this pile to take the next two pictures