myLargescale.com > Community > Forums - View Single Post - Making of Old Joe


View Single Post
Old 11-25-2019, 10:42 AM   #2 (permalink)
choochoowilly
Senior Member
 
Join Date: Oct 2016
Location: Ormond Beach, Fl.
Posts: 293
Default Making of old joe

Got a little done on Old Joe, first set of rivets for the boiler, cut the boiler to the to be length, finished the smoke box door, was able to find a rectangle box for the water reservoir and caped it with the hatch cover from an old Bachmann tender. The reservoir will feed the side tanks via some rubber tubing, actually the outer sheath from an electrical cord, this will allow the engine to take on water from the water tank rather than filling each tank separately via a hose. Started size fitting the front bolster and step cowcatcher, I have a LGB cow catcher I could use but being as this suppose to be a small industrial engine I opted for the former. Was able to stumble across so old plastruct vinyl cover wire and a grooved bracket to mount it with so I made some air piping for under one of the running boards. No the smoke stack isn't going to be square just trying to get an idea on height and that tubing was handy. Found the top to the steam dome just have to cut it to size. Sort of on off building this week trying to get the house ready for guest for thanksgiving of which there will be some little ones, so thought is out of site out of mind, just hope I can remember where I have hidden stuff after wards, more to come, Bill
choochoowilly is offline   Reply With Quote
 
Powered by vBadvanced CMPS v3.2.3

All times are GMT -4. The time now is 10:22 PM.



Powered by vBulletin® Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2020 DragonByte Technologies Ltd.